1、 Instrument Overview
The XGH-63 plastic pipeline system hot and cold water circulation testing machine is suitable for inspecting the leakage of various pipes and fittings after being assembled according to the specified requirements and subjected to internal pressure for a specified number of times of temperature alternation. This instrument is mainly used for pipeline system testing after the assembly of pipes and fittings. Standard Test Methods for Thermoplastic Pipe and Fitting Systems Applicable to Cold and Hot Water Systems.
2、 Compliant with standards
ISO10508-2006 "Plastic piping systems for cold and hot water installations, classification and design guidelines"
GB/T 18997.1-2020 "Aluminum plastic composite pressure pipes - Part 1: Aluminum pipe lap welded aluminum-plastic pipes"
GB/T 18997.2-2020 "Aluminum plastic composite pressure pipes - Part 2: Aluminum pipes - Butt welded aluminum-plastic pipes"
GB/T 18742.1-2017 "Polypropylene piping systems for hot and cold water - Part 1: General principles"
GB/T 18742.2-2017 "Polypropylene piping systems for hot and cold water - Part 2: Pipes"
GB/T 18742.3-2017 "Polypropylene piping systems for hot and cold water - Part 3: Pipe fittings"
GB/T 18992.1-2003 "Cross linked polyethylene piping systems for hot and cold water - Part 1: General principles"
GB/T 18992.2-2003 "Cross linked polyethylene piping systems for hot and cold water - Part 2: Pipes"
GB/T 18998.1-2003 Chlorinated polyvinyl chloride piping systems for hot and cold water - Part 1: General principles
GB/T 18998.2-2003 Chlorinated polyvinyl chloride piping systems for hot and cold water use Part 2: Pipes
GB/T 18998.3-2003 Chlorinated polyvinyl chloride piping systems for hot and cold water - Part 3: Pipe fittings
GB/T 19473.1-2020 Polybutylene (PB) Pipeline Systems for Cold and Hot Water - Part 1: General
GB/T 19473.2-2020 "Polybutylene (PB) Pipeline Systems for Cold and Hot Water - Part 2: Pipes"
GB/T 19473.3-2020 "Polybutylene (PB) Pipeline Systems for Cold and Hot Water - Part 3: Pipe fittings"
3、 Technical parameters
1. Pressure control range: 0.4MPa -1.6MPa can be set arbitrarily
2. Pressure control accuracy: set value ± 0.05MPa (there is no water hammer phenomenon during cold and hot water alternation)
3. Switching time between hot and cold water: less than 1 minute
4. Each cycle of hot and cold water: 15 minutes
5. Number of cycles: Any setting between 1-10000.
6. Temperature indication error: 0.5 ℃
7. Temperature uniformity inside the constant temperature bath: ≤ ± 1 ℃
8. Temperature control range: Cold water: 15 ℃~Room temperature Hot water: Room temperature~95 ℃
9. Applicable pipe diameter: ¥ 63
10. Number of test stations: 6 channels
11. Power supply: 380VAC/220VAC mixed use
12. Standard rated power: 25kW
13. Instrument size: 5550mm x 2800mm x 1800mm
14. Instrument installation size: 8000mm x 7000mm x 1800mm
Advantages: 1. The design principle ensures the reliability of the instrument. During the test operation, high pressure is generated in the sample pipeline, while other parts of the instrument maintain normal pressure.
2. Energy saving design limits reduce experimental operating costs.
3. Equipped with comprehensive protective devices, the instrument will automatically shut down in case of abnormal situations.
4、 Instrument configuration
Number |
Model name |
Function |
1 |
Multi-stage centrifugal pump |
Provide a source of pressure |
2 |
circulating pump |
Provide a uniform temperature field |
3 |
Variable frequency governor |
Stable pressure |
4 |
Pressure transmitter |
Provide pressure acquisition signals |
5 |
Insulated stainless steel cold water tank |
Provide cold water for testing |
6 |
Insulated stainless steel hot water tank |
Provide hot water for testing |
7 |
Stainless steel temperature sensor |
Temperature signals of hot and cold water tanks and inlet/outlet |
8 |
Refrigeration cycle unit |
Control the water temperature of the cold water tank |
9 |
Heating device |
Control the water temperature of the hot water tank |
10 |
Pressure display gauge |
Display the pressure inside the sample |
11 |
Electric control cabinet |
Information collection and control |
12 |
Sample installation box |
Install the sample location and provide protection |
13 |
solenoid valve |
Switching between hot and cold water |
14 |
The clamping pipeline of the sample |
Clamp the sample |